The Problem...

The Challenges with Traditional Ironwork Reinstatement Methods

Are these challenges costing your business time, money, and reputation?

ironworks icons-31.png__PID:e5f2be38-5a80-429e-83c3-14fa7ddf4b7a

Safety Concerns

Hot-works create fire risks and safety hazards. What's the impact of a works-related accident on your business, insurance, and reputation?

ironworks icons-32.png__PID:090c55f3-5ed9-4a68-bcc6-a931f7e30528

Repeat Offenders

Premature failures lead to costly rework, customer complaints, and damage to your reputation. How much is each callback costing you?

ironworks icons-33.png__PID:2b3f8364-1582-4c0b-a28c-f7b0bdfbe334

Carbon Reduction

Environmental regulations are tightening. When will you be forced to make changes to reduce your carbon footprint?

Presenting...

A NEW REVOLUTIONARY APPROACH TO IRONWORKS

Compare
Ironworks section break 2.jpeg__PID:af356d07-d796-4d72-8fae-f4f9a9efa6f5Magma LinkedIn Banner 25-03.png__PID:4f6e3987-7aaa-4af2-97ca-4c933d319474

About Us

WHY CHOOSE the MAGMA Ironwork System?

Revolutionary cold-applied technology that transforms ironwork installation...

Ironwork diagrams for landing page-12.png__PID:0abf9ed5-47dd-46d2-af17-cf0dc708772dIronwork diagrams for landing page-13.png__PID:b8621500-50fa-4595-8b66-e5f2d7860214Ironwork diagrams for landing page-14.png__PID:4232415a-9c4e-4ff3-a36a-844cc5f17708
Ironwork diagrams for landing page-15.png__PID:f71f3588-2571-4394-8c47-d20dbb07a3d3

No Hot-Works Permits

Eliminate the need for hot-works permits entirely with our 100% cold applied system. Reduce delays, simplify operations, and improve site safety.

100% Right First Time

Guaranteed elimination of defects with our proven system. No more callbacks, no more rework - just perfect results every time.

Operational Savings

Reduce crew size, eliminate boiler equipment, reduce waste, and save on fuel and vehicle costs.

Enhanced Safety

Eliminate fire risks and reduce accident potential with cold applied technology. Protect your workforce and reduce liability.

Carbon Reduction

Significantly reduce your carbon footprint by eliminating boiler fuel consumption and reducing equipment requirements.

Simplified Application

Battery-powered mixing, reduced cut-back requirements, and a streamlined 3 part system that increases efficiency.

image (20).jpeg__PID:4cfd1ffc-4179-4394-810b-9f2995d19fba

Project Gallery

MAGMA Ironworks in the Field

New Magma Ironwork Images 2025-13.jpg__PID:875b6d5e-6de8-4b65-a9fc-1ac0bf6efbba
PermaFyx cold applied reinstatement.jpeg__PID:732ea434-3b85-40af-929c-23bdbf5bd15d
Cappagh ironworks permafyx.jpeg__PID:a1e9519a-abc2-4614-a3dd-a4e633e11ec8
New Magma Ironwork Images 2025-08.jpg__PID:4a1fb1e2-b488-4d70-b538-93457e901205
New Magma Ironwork Images 2025-10.jpg__PID:1353577f-bfe1-4238-b0c8-7989a0fe3521
PermaFyx L274 Image 1-01.png__PID:57d8562f-759f-4857-aa32-8645576211b5
PermaFyx Bath Road HERO
PermaFyx HRA install project.jpeg__PID:3751ea6c-fcb5-402e-9b50-5146ba3889de
New Magma Ironwork Images 2025-06.jpg__PID:20061bef-7c78-4caa-bf0f-8b6de3da36bf
New Magma Ironwork Images 2025-04.jpg__PID:1eff2a2a-4774-4093-aa7d-5a8e81a03c86
PermaFyxL273HRAFinisharounddrain

Key Features

Revolutionary Technology

Compare traditional methods with the MAGMA approach

100% Cold Applied: Zero heating equipment required

Zero Compaction Required: Eliminates bedding mortar fracture issues

One Crew Complete Job: Zero reliance on tar squads

Reduced Excavation: 150mm cut-back vs 250mm traditional

Battery Powered: Simple mixing with portable equipment

Quick Installation: Faster setup and completion times

Aspect

MAGMA

Traditional

Crew Size

3 people

5 people

Equipment

Van + trailer

7.5t truck + boilers

Cut-back

150mm

250mm

Zero Hot-Works

Not required

Required

Defect Rate

Zero defects

Early failures common

Job Completion

First time permanent

Multiple visits required

Case Studies

REAL RESULTS. REAL ROADS.

CS - THUMBNAIL 1.jpg__PID:a8c617ef-8eb7-4661-9425-0a63c73bff28
CS - THUMBNAIL 5.jpg__PID:b58e46ce-b94a-4d8a-9582-bd323ede101c
CS - THUMBNAIL 3.jpg__PID:4c051d79-bef3-4f23-8c8a-8aa6d2d4d32b
CS - THUMBNAIL-03.jpg__PID:9e8333e5-9aa7-465d-81bc-50eb70faf1c2
CS - THUMBNAIL-04.jpg__PID:1cf16f56-44af-40bf-846c-b435fa9e8a94
CS - THUMBNAIL 4.jpg__PID:e138832e-f30e-4da4-b803-67114a17a107
CS - THUMBNAIL 2.jpg__PID:50a90099-8bcf-49c7-a165-3326283f3553
View All Case Studies

Become a MAGMA-approved installer!

The programme is designed to develop your technical knowledge, practical application and implementation of these specialist cold-applied products.

Magma Approved Installer Logo-01.

Product Support

Comprehensive Training & Support

World-class technology backed by world-class support

Approved Installer Training

2-day comprehensive training programme covering theory, hands-on practice, and live installations with ongoing certification support.

100+ Hours Online Tutorials

Access extensive library of online training materials, technical guides, and best practice resources available 24/7.

99% Stock Availability

Same-day shipping on orders received by 15:30 with 100% on-time-in-full delivery guarantee.

Technical Support

Access to industry-leading technical team, continuous staff development, and collaboration on product improvements.

Specialist Cold-Applied Solutions

Discover the Full MAGMA Ironwork System

Featured products:

Meon's Shimpack in the Ironwork system
Meon's Shimpack in the Ironwork system

Shimpac Roadshim Plank 610x100x12mm

Magma HardMaster W620 CD534 Polymer Modified Bedding Mortar Red 20kg Bucket
Magma HardMaster W620 HA104 Polymer Modified Bedding Mortar application
Magma HardMaster W620 CD534 Polymer Modified Bedding Mortar Red 20kg Bucket
Magma HardMaster W620 HA104 Polymer Modified Bedding Mortar application

Magma HardMaster W620 CD534 Polymer Modified Bedding Mortar Red 20kg Bucket

Meon's HardMaster W615 Rapid Strength Flowable Concrete
HardMaster W615 Rapid Strength Flowable Concrete
https://youtu.be/lMP0ILapYN4
https://www.youtube.com/watch?v=v_qo8XTRdUU
Meon's HardMaster W615 Rapid Strength Flowable Concrete
HardMaster W615 Rapid Strength Flowable Concrete
https://youtu.be/lMP0ILapYN4
https://www.youtube.com/watch?v=v_qo8XTRdUU

HardMaster W615 Rapid Strength Flowable Concrete 25kg Bag

Magma UltraCrack L270 HAPAS Approved MMA Overbanding & Crack Repair
UltraCrack L270 finished results
UltraCrack L270 being applied on asphalt crack
Magma UltraCrack L270 MMA Crack Repair & Overbanding
Magma UltraCrack L270 HAPAS Approved MMA Overbanding & Crack Repair
UltraCrack L270 finished results
UltraCrack L270 being applied on asphalt crack
Magma UltraCrack L270 MMA Crack Repair & Overbanding
https://youtu.be/j7Z8JSjBMIM

Magma UltraCrack L270 HAPAS Approved MMA Overbanding & Crack Repair

MAGMA Ironwork System Frequently Asked Questions (FAQs)

Everything you need to know about using the MAGMA Ironwork System.

What is PermaFyx and how does it work?

PermaFyx are a range of cold applied, Methyl Methacrylate (MMA) based, permanent surface repair solutions. 

These solutions are cold applied and require zero compaction, eliminating the need for hot works and compaction equipment during the repair process.

PermaFyx is not reliant on mass, its strength is gained through the cross links formed during chemical reaction.

What types of surfaces can PermaFyx be used on?

PermaFyx is perfect for very high stress areas. 

Typically we encourage PermaFyx as the perfect non-compaction surface coarse for Ironwork Reinstatement, but clients have usedPermaFyx for surface patching and pothole repair successfully.

What are the different PermaFyx kits avilable?

PermaFyx is available in a range of grades and colours, including asphalt, HRA and concrete.

How long does PermaFyx take to cure?

PermaFyx takes approximately 2 minutes to mix up and cures through a chemical bond to go solid within 30 minutes and ready to open to traffic, making the system an ideal solution for reactive repairs where the area can only be closed for a minimal amount of time.

Is PermaFyx safe and easy to apply?

Unlike other cold applied products, PermaFyx eliminates the need for compaction equipment, allowing for greater versatility in application, even in hard-to-reach areas.

The kit-form reduces manual handling requirements and lowers the risk of hand-arm vibration syndrome (HAVS), promoting safer working conditions.

Methyl Methacrylate (MMA) has lower health risks than epoxies as they don't contain isocyanates, unlike epoxies and polyurethanes. However, MMAs do produce a strong, unpleasant smell during use.

Ensure adequate ventilation, wear proper PPE, and follow the guidlines on our safety data sheet to minimise health risks.

Get in Touch

Have a Question?

Our team is here to help you choose the right solution for your repair project. Whether you're a contractor, council, or private operator - we'll guide you through it.

Ready to Transform Your Operations?

Join other contractors benefiting from this revolutionary approach to ironwork reinstatement. Start your journey to increased profitability and zero defects today.